SUBSTATION TESTING AMP COMMISSIONING IN BANGLADESH

Substation cable tray size requirements

Substation cable tray size requirements

Standard cable tray widths per IEC 61537 and manufacturers' ranges are typically 50, 75, 100, 150, 200, 225, 300, 400, 450, 500, 600, 750, 900, and 1000mm. maintain spacing or to keep cables in place when the tray is ect the minimum bend ra-dius for cables as they exit the bottom of the cable tray. A rung spacing of 6 to 9 inches (150 to 230 mm) is preferable when the cable tray cont d for instrumentation and control applications that require. Ladder cable tray is available in widths of 6, 9, 12, 18, 24, 30, 36, 42 and 48 inches with rung spacings of 6, 9, 12 or 18 inches. These dimensions define the available cross-sectional area for cable installation.

Read More
Relay Protection Unit Commissioning Scheme

Relay Protection Unit Commissioning Scheme

This paper suggests a process for performing consistent and thorough commissioning tests through many sources: breaking out relay logic into schematic drawings; using SER, metering, and event reports from relays; simulating performance using end-to-end testing and lab. The testing and verification of relay protection devices can be divided into four groups: Type tests are needed to prove that a protection relay meets the claimed specification and follows all relevant standards. Installation of protection relays at site creates a number of possibilities for errors in the implementation of the scheme to occur. Even if the scheme has been thoroughly tested in the factory, wiring to the CTs and VTs on site may be incorrectly carried out, or the CTs/VTs may have been. The SPCS believes that it would be beneficial for IEEE to produce a document on commissioning testing in an effort to he ak V co mon practice explained in IEEE C37.

Read More
Introductory Guide to Relay Protection Commissioning

Introductory Guide to Relay Protection Commissioning

This paper suggests a process for performing consistent and thorough commissioning tests through many sources: breaking out relay logic into schematic drawings; using SER, metering, and event reports from relays; simulating performance using end-to-end testing and lab. This happens because the main function of protection devices is related to operation under fault conditions so these devices cannot be tested under normal operating conditions. Abstract—Performing tests on individual relays is a common practice for relay engineers and technicians. As a Relay Protection Engineer, your work in relay testing and commissioning is critical to ensuring system safety and continuity.

Read More
FPGA Fiber Optic Communication Testing

FPGA Fiber Optic Communication Testing

This paper presents an effective approach designed to ad-dress challenges associated with the testing, parameter tun-ing and performance monitoring of optical interconnects in FPGA-based systems. Targeting fiber-optic communication systems, the Fiber-on-Chip (FoC) emulation approach considers not only the receiver DSP to be verified, but it additionally emulates both transmitter and communication channel so that a complete end-to-end commu-nication system is integrated in an FPGA or ASIC. Gothenburg, Sweden 2017 The Author grants to Chalmers University of Technology and University of Gothenburg the non-exclusive right to publish the Work electronically and in a non-commercial purpose make it accessible on the Internet. Efficient implementation of digital signal processing (DSP) algorithms is critical to the advancement of high-speed fiber-optic communication systems. However, as these systems become more complex, the effort spent on test and characterization of the implementation can become prohibitively large.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain