WIP: For my Heavy Modular Frame level. (4) Normal lines and (1
WIP: For my Heavy Modular Frame level. (4) Normal lines and (1) 80% line splitter system. So total there needs to be 144 Steel Pipes per minute. 24/30 = 80%. I was limited by a few items so I would
Contact Us