How often should relay protection systems undergo a comprehensive inspection
A full visual, mechanical, and electrical test should be performed every 24 months for electromechanical and solid-state relays, and every 36 months for microprocessor relays. A comprehensive relay protection system maintenance checklist ensures that every relay, control circuit, and protection scheme receives the verification it needs to perform reliably under fault conditions. Rare operation, critical function: Protective relays may operate only once every several. As far as I'm concerned*, a numeric relay can be tested by reviewing the alarm log looking at the metering. For microprocessor units, make sure the relay is displaying the correct date and time.
Read More