THE COMING COMPUTE WAR IN UKRAINE

How to connect the wiring at the back of the distribution box

How to connect the wiring at the back of the distribution box

Connect the input and output wires to the corresponding terminals of the distribution box. It serves as a central hub for distributing electricity throughout a building, ensuring that power is delivered safely and efficiently to all the required locations. Materials: Inspect the cable distribution box and its accessories (such as fixed brackets, screws, terminal blocks, etc.

Read More
Ukraine LPO optical module 100G

Ukraine LPO optical module 100G

The 100G-DR-LPO specification by the LPO (Linear Pluggable Optics) MSA defines 100 Gb/s/lane 53. 125 GBd PAM4 optical interfaces, optical links using standard single-mode fiber with up to 500 m reach, and host-module electrical interfaces for hosts with. The Linear Pluggable Optics Multi-Source Agreement (LPO MSA) group has announced the release of its new 100Gbps-per-lane Linear Pluggable Optics (LPO) specification, designed to enable optical interconnects supporting up to 800 Gigabit Ethernet connectivity. According to the LPO MSA, an LPO solution offers power savings for optical interconnect by removing the digital signal processing (DSP) function from the pluggable optical module. 1 shows the typical block diagram of a pluggable transceiver consisting of on-board lasers, optics, a Photonics die housing the modulator. The idea is simple: instead of a DSP (digital signal processor) inside the module – replacing it with transimpedance amplifier (TIA) and a driver chip with high linearity and EQ capability – LPO shifts signal processing into.

Read More
Ukraine Base Station Energy Solution 100kW Solution

Ukraine Base Station Energy Solution 100kW Solution

This project deploys a 100kW/261kWh energy storage system (ESS) to create an integrated solar-storage-charging solution, enabling smart, efficient, and green EV charging operations. At its core, this solution is built on a high-performance C&I hybrid inverter platform, integrating PV generation, battery storage, diesel generators, and grid interaction into a unified energy system. HITEK ENERGY has successfully implemented a comprehensive renewable solar energy solution for a manufacturing facility in Ukraine. • Large Energy Storage: BOS-B battery delivers 215kWh per cluster, supporting up to 16 packs per PCS.

Read More
Drilling holes on the side of the cable tray

Drilling holes on the side of the cable tray

To avoid transverse bending at higher loads, a joint plate must be used for tray widths of 400 mm or more in the joint area of the cable trays that are to be connected. Developed by Interstates, this cable tray cutting guide acts as a guide for a metal cutting circular saw for cutting the side rail of a cable tray as well as a guide for drilling the connecting holes in the cable tray. A rung spacing of 6 to 9 inches (150 to 230 mm) is preferable when the cable tray cont d for instrumentation and control applications that require. The most common method of locating the hole positions is to use a splice plate as a template.

Read More
T-junction on the front of the cable tray

T-junction on the front of the cable tray

This junction allows reliable and neat formation of a T-shaped branching of cable routes, ensuring stable and safe cable routing in different directions. Fitting for the construction of T-joints or crossovers of Metatray® insulating trays for the conduction of electrical and telecommunication cables.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain