SWINSTIE PIPE BRIDGE REPLACEMENT 2018

2018 Optical Cable Project

2018 Optical Cable Project

The Pakistan-China Fiber Optic Project is an 820 kilometer long optical fiber cable connecting Pakistan and China; it was laid down between the Khunjerab Pass on the China-Pakistan border and the Pakistani city of Rawalpindi. Some format issues inherent in the e-media version may also appear in this print version. ELECTRICAL DUOBINARY CODING FOR 25 GB/S PONS BASED ON DSP-FREEOn July 13, 2018, the opening ceremony of the key project "The Belt and Road Initiative" (B&R) – " Pak-China Optical Fiber Cable" was held in Islamabad, the capital of Pakistan.

Read More
2018 Optical Cable Procurement Price Limit

2018 Optical Cable Procurement Price Limit

This guidance is aimed primarily at procurement practitioners within contracting authorities in the European Union who are responsible for planning and delivering the purchase of public works, supplies.

Read More
Gantry Drive Bridge Support

Gantry Drive Bridge Support

Gantry cranes for bridge construction play a crucial role in both precast yards and on-site erection processes. They are designed to handle heavy girders safely and efficiently, streamline workflow, and improve productivity across the entire bridge project lifecycle. They enable precise positioning, especially in large workspaces, with travel distances of up to 1,500 mm and a repeatability of less.

Read More
How to take good photos of bridge frames

How to take good photos of bridge frames

Early morning or late evening light will highlight textures and warmth to the scene but don't overlook bright days either as strong shadows will make statues and other detail stand out from the walls.

Read More
Bahrain Through Bridge

Bahrain Through Bridge

The King Fahd Causeway (Arabic: جسر الملك فهد, romanized: Jisr al-Malik Fahd) is a 25 km (15. 5 mi) long series of bridges and causeways connecting Khobar, Saudi Arabia, and Al Jasra, Bahrain across the Gulf of Bahrain. The King Fahd Causeway is a critical 25km economic and logistics corridor linking Saudi Arabia and Bahrain Kind Fahd Causeway/Image: Getty Images Vehicle traffic across the King Fahd Causeway has resumed following a brief precautionary suspension triggered by regional alerts, authorities confirmed.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain