How to wire the relay protection test
Press the test button and after receiving fault current the relay will be tripped. When the transformer wiring type is Y/Y (Y0), the test wiring is very simple: when testing phase A, the tester IA is connected to the phase A of the high voltage side, and the tester IB is connected to the phase a of the low voltage side. The fundamental objective of protection function testing is to ensure that specific protection schemes (such as differential and distance. It discusses reviewing relay application drawings and settings, establishing communication with the relay, connecting the relay set for testing, creating a test plan, performing element and logic testing, and. This handbook covers the code of practice in protection circuitry including standard lead and device numbers, mode of connections at terminal strips, colour codes in multicore cables, dos and donts in execution.
Read More