Relay Protection Unit Commissioning Scheme
This paper suggests a process for performing consistent and thorough commissioning tests through many sources: breaking out relay logic into schematic drawings; using SER, metering, and event reports from relays; simulating performance using end-to-end testing and lab. The testing and verification of relay protection devices can be divided into four groups: Type tests are needed to prove that a protection relay meets the claimed specification and follows all relevant standards. Installation of protection relays at site creates a number of possibilities for errors in the implementation of the scheme to occur. Even if the scheme has been thoroughly tested in the factory, wiring to the CTs and VTs on site may be incorrectly carried out, or the CTs/VTs may have been. The SPCS believes that it would be beneficial for IEEE to produce a document on commissioning testing in an effort to he ak V co mon practice explained in IEEE C37.