GST INDUSTRIAL COMPUTER EMBEDDED AUTOMATION

Cold Aisle Computer Room Design

Cold Aisle Computer Room Design

The hot aisle /cold aisle data center layout was originated by IBM in 1992 and it is one of the oldest ways to save energy in the data center. When implemented correctly, they improve efficiency, reduce energy consumption, extend equipment life, and enhance overall reliability. Why should the computer room design hot and cold aisles, design principles and how to construct? Why should the computer room design hot and cold aisles? Because the computer room uses the hot aisle and cold aisle to change the previous practice of placing the cabinets in the same direction in the. Efficient airflow management in data centers relies heavily on proper Hot Aisle and Cold Aisle configurations.

Read More
Add lightning protection to the power distribution box in the computer room

Add lightning protection to the power distribution box in the computer room

The power distribution box of the computer room should be equipped with SPD (anti-electromagnetic surge) protection devices to prevent the power supply of the computer room from being cut off due to electromagnetic pulses caused by lightning strikes. Our light-ning and surge voltage protection systems are per-fectly matched to one another and to the requirements in the different zones – from the air-termination device, which must arrest the full energy of a lightning strike, through to fine power protection, which eliminates the last voltage. one designed to protect the building structure and fabric and a second to protect sensitive equipment inside the building.

Read More
Inspection Batch of Integrated Cabling System for Computer Room

Inspection Batch of Integrated Cabling System for Computer Room

Interactive checklist for inspecting communications cabling and device installation, allowing comments and export as PDF/Excel. Gather necessary tools and equipment for inspection, such as cable testers, multimeters, and safety gear. This statement has been developed in direction to confirm that the work is in compliance with Quality Control activities during implementation of ICT Components for Design and Construction The purpose of this document is to provide minimum requirements for the procedure to be implemented and. A Queensland Government Enterprise Architecture (QGEA) standard provides information for Queensland Government departments on the mandatory and recommended practices for a given topic area.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain