GROUNDING OR EARTHING SCHEME IN DCS OR PLC SYSTEMS

Fiber Optic Cable Lightning Protection and Grounding Scheme

Fiber Optic Cable Lightning Protection and Grounding Scheme

The major purpose of lightning protection systems is to conduct the high current lightning discharges safely into the Earth/ground. For example, it will not only affect all DWDM fiber channels in short bursts, but also affect transmission directions. This Applications Engineering Note (AE Note) discusses conventional bonding and grounding practices for conductive fiber optic cable and hardware installations within the scope of the National Electrical Code (NEC). Lightning poses several significant risks to fiber optic cables and the networks they support: Cable Damage: A lightning strike can directly damage fiber optic cables, causing signal loss, equipment failure, or complete network outages.

Read More
Which PLC optical splitter is the best

Which PLC optical splitter is the best

Compared with traditional FBT splitters, PLC splitters offer better wavelength consistency, lower insertion loss, improved uniformity, and better scalability for FTTH applications. It basically helps distribute signals to multiple endpoints without messing up the signal quality. A PLC splitter (Planar Lightwave Circuit Splitter) is an essential passive component in fiber optic networks. Accurately understanding the principles, differences, and applicable boundaries of the FBT vs. This article provides a clear technical comparison of the definitions, technical principles, key.

Read More
PLC splitter low-loss sample quality assurance

PLC splitter low-loss sample quality assurance

In PLC splitters, the photolithography process ensures a low and uniform PDL, so even as the polarization state of light changes within the fiber, signal loss remains nearly constant. This stability helps maintain consistent service quality in FTTx and PON deployments. In this article, we explore the quality assurance process of Fiber Optic PLC Splitters and its importance in ensuring optimal network performance. The products chosen to performance the qualification testing are 1x8 PLC splitters by following requirement of Telcordia GR-1221-CORE. With a wide operating wavelength range, high optical performance and very high reliability these are suitable for use in PON networks to realize perfect optical si and LC-APC Adapters.

Read More
Several grounding points for communication tower feeder lines

Several grounding points for communication tower feeder lines

The fundamental objective of this document is to provide guidelines and practices for Ericsson site equipment grounding, with recommended methods that are essential to protect personnel, minimize component failure, and optimize performance by reducing electrical noise. #2 AWG minimum bare tinned solid copper ground wire may be used to bond air terminals to the tower. Because bonding and grounding systems within a building are intended to have one electrical potential, coordination between electrical and telecommunications bonding and grounding systems is essential during design and installation. It can enter via the feeder screens that are grounded at the top of the tower, via surge protective devices within or external to tower mounted electronics, via side flashing to exposed connection points and other electrical mechanisms.

Read More
Relay Protection Unit Commissioning Scheme

Relay Protection Unit Commissioning Scheme

This paper suggests a process for performing consistent and thorough commissioning tests through many sources: breaking out relay logic into schematic drawings; using SER, metering, and event reports from relays; simulating performance using end-to-end testing and lab. The testing and verification of relay protection devices can be divided into four groups: Type tests are needed to prove that a protection relay meets the claimed specification and follows all relevant standards. Installation of protection relays at site creates a number of possibilities for errors in the implementation of the scheme to occur. Even if the scheme has been thoroughly tested in the factory, wiring to the CTs and VTs on site may be incorrectly carried out, or the CTs/VTs may have been. The SPCS believes that it would be beneficial for IEEE to produce a document on commissioning testing in an effort to he ak V co mon practice explained in IEEE C37.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain