FIJI PRIVATE ISLAND WITH A QUARTER MILE BRIDGE TO THE

Source of Bahrain Grid Bridge

Source of Bahrain Grid Bridge

The project to build the bridge began during an official visit to Bahrain in 1954 by King Saud; his wish was to nurture and further solidify the bonds between the two countries. OverviewThe King Fahd Causeway (: جسر الملك فهد, : Jisr al-Malik Fahd) is a 25 km (15. 4, which, with a total area of 660,000 square metres (7,100,000 sq ft), is the largest of the embankments. On 6 July 2010, Saudi newspapers quoted King Fahd Causeway Authority chief Bader Abdullah Al-Otaishan as saying that the King Fahd Causeway was to undergo a major expansion projected to cost $5.

Read More
Building a Bridge Across a Ravine

Building a Bridge Across a Ravine

A simple suspension bridge (also rope bridge, swing bridge (in ), suspended bridge, hanging bridge and catenary bridge) is a primitive type of in which the deck of the bridge lies on two parallel load-bearing cables that are anchored at either end. The cables follow a shallow downward arc which moves in response to dynamic loads on the bridge deck.

Read More
Colored Bridge Structures in South Sudan

Colored Bridge Structures in South Sudan

The Juba Nile Bridge is composed of two adjacent 252 meter spans over the in,, on the, and until 2022 provided the only access over the to. It was built in 1972 during the regime of General, from two World War II era bridges, costing $2.

Read More
Scraper Bridge

Scraper Bridge

A scraper bridge is a mechanical construction forming an integral part of a waste-water treatment plant. It is used for clearing sediment into a sludge collector pit or alternatively for depositing floating substances into a scum removal container. Designed to separate out the solids from the liquid by either settlement or flotation. Designed for efficiency, durability, and ease of maintenance, our scrapers deliver reliable sediment and sludge removal to support the smooth operation of circular.

Read More
Gantry Drive Bridge Support

Gantry Drive Bridge Support

Gantry cranes for bridge construction play a crucial role in both precast yards and on-site erection processes. They are designed to handle heavy girders safely and efficiently, streamline workflow, and improve productivity across the entire bridge project lifecycle. They enable precise positioning, especially in large workspaces, with travel distances of up to 1,500 mm and a repeatability of less.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain