BEATING THE HEAT IN THE DATA CENTER THE INDUSTRY''S FIRST

How to connect the wiring at the back of the distribution box

How to connect the wiring at the back of the distribution box

Connect the input and output wires to the corresponding terminals of the distribution box. It serves as a central hub for distributing electricity throughout a building, ensuring that power is delivered safely and efficiently to all the required locations. Materials: Inspect the cable distribution box and its accessories (such as fixed brackets, screws, terminal blocks, etc.

Read More
Should ladder-type cable trays be run close to the bottom of the beam

Should ladder-type cable trays be run close to the bottom of the beam

As uniform as possible, however, the Run Length Between Supports should ideally be in the range of 4 to 6 feet as indicated in the NEC design and load factor. This publication is intended as a practical guide for the proper and safe* installation of cable ladder systems, cable tray systems, channel support systems and associated supports. Ladder cable tray without covers provides for maximum air flow, dissipating heat produced in current carrying conductors. Wire Mesh Cable Trays are mainly used for telecommunication and fiber optic cables. maintain spacing or to keep cables in place when the tray is ect the minimum bend ra-dius for cables as they exit the bottom of the cable tray.

Read More
Reserved length on the side of the fiber optic cable joint in the duct

Reserved length on the side of the fiber optic cable joint in the duct

In order to facilitate maintenance, when laying the cable, the joint well should be 1#, and the order should be analogized. (FOA) was founded in 1995 to help develop the workforce to build the fiber optic networks to support a rapid expansion in communications and the Internet. On runs from 40m to 100m, use proper lubricants and make sure they are compatible with the cable jacket. Although the standard covers premises installations, many of the provisions included here ar SI/ NFPA 70, the National Electrical Code (NEC).

Read More
T-junction on the front of the cable tray

T-junction on the front of the cable tray

This junction allows reliable and neat formation of a T-shaped branching of cable routes, ensuring stable and safe cable routing in different directions. Fitting for the construction of T-joints or crossovers of Metatray® insulating trays for the conduction of electrical and telecommunication cables.

Read More
High-density operation and maintenance of data center racks

High-density operation and maintenance of data center racks

This blog explores how smart rack design, airflow discipline, and cable management strategies can make density sustainable while preserving serviceability and operational calm. More than 60% of data center operators are preparing to increase the number of IT racks in their data center installations to properly handle the growing workload. 1 These expanded IT facilities are called high-density data centers, and they're becoming increasingly popular as companies rely more. Understanding rack density helps operators plan power distribution, cooling capacity, and overall data center efficiency. According to the AFCOM State of the Data Center Report, average rack density increased from 7 kW per rack in 2021 to 8.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain