AWARDED TENDER — SOUTH SUDAN ENERGY SECTOR ACCESS

Number of communication base stations on the South Sudan Tower

Number of communication base stations on the South Sudan Tower

Since the Comprehensive Peace Agreement of 2005, over 30 FM radio stations have been set up across the country with the encouragement of the Sudan People's Liberation Movement (SPLM) run government. Radio networks and stations are run and funded by Government, Churches, community organizations, internatio.

Read More
Colored Bridge Structures in South Sudan

Colored Bridge Structures in South Sudan

The Juba Nile Bridge is composed of two adjacent 252 meter spans over the in,, on the, and until 2022 provided the only access over the to. It was built in 1972 during the regime of General, from two World War II era bridges, costing $2.

Read More
South Africa Cable Tray Procurement Tender

South Africa Cable Tray Procurement Tender

Quotation are invited for Cable Tray;Wire Mesh;Galv;150mmx50mm Delivery Date: 2025/12/08 Delivery To: Electricity - Bloemhof MATERIALS STORE / PH: 444 1859 Delivery Address: 1 Bloemhof Road, Bellville Closing Date: 2025/10/09 Closing Time: 12:00 PM Description: 30 each x. TendersOnTime, the best online tenders portal, provides latest South Africa Cable tenders, RFP, Bids and eprocurement notices from various states and counties in South Africa. Track every opportunity from National Treasury, all 9 provinces, every major metro and State Owned Enterprise and much much MORE, all in one searchable database with real-time alerts! Cancel anytime from your dashboard ·. Detailed monthly data for public procurement via eTender portal can be downloaded in Open Contracting Data Standard (OCDS) compliant CSV, JSON and Excel formats. See below for a list of Network Cabling Supplies, Installation and Maintenance Tenders. Tender Cancellation for the supply and delivery of pipes and fittings on an as and when required basis at Arnot Power Station.

Read More
South Sudan Bridge Construction

South Sudan Bridge Construction

Some of the grants were used for the construction of a new bridge over the to relieve traffic congestion in and improve the transportation capacity and connectivity of. The new proposed Freedom Bridge funded by (JICA) would be 560 meters long with sufficient width for both east and we. Juba Bridge, probably one of South Sudan's oldest and most important infrastructures still stands strong and serves the landlocked nation despite clocking half a century since its construction partly with funding from the Kingdom of Netherlands. South Sudan, which gained independence from Sudan in July 2011 after many years of conflict, faces a serious lack of social and economic infrastructure.

Read More
BESS Energy Storage System Remote Monitoring Solution UK

BESS Energy Storage System Remote Monitoring Solution UK

The InteliNeo 530 BESS offers safe and reliable control for the battery energy storage system and all it's key parts, and can help optimise costs, decrease noise pollution and reduce emissions. Think of them as a reliable battery bank on a larger scale - paired with solar, the grid, or a generator, they deliver clean, dependable energy in the most convenient and. But to get the most out of these systems, robust monitoring and security measures are essential. ocations are often difficult to reach and it might be too late to remedy the fault. By in-stalling a remote monitoring system, a clear vision of consumption, electrical parameters and equip-ment status is always available through web-based applicat s, thereby quality, optimized ma are always. Control, protect or monitor all essential parts within the Battery Energy Storage System (BESS) with ComAp's solutions to ensure the highest level of Storage System performance and effective dispatching of the stored energy to the grid.

Read More

Get In Touch

Connect With Us

📱

Spain Office (HQ)

+34 936 214 587

🇪🇺

EU Technical Center

+49 89 452 38 217

📍

Headquarters (Spain)

Calle de la Tecnología 47, 08840 Viladecans, Barcelona, Spain